SYZX96型绳索取心液动锤在甘肃李坝金矿
DOI:
作者:
作者单位:

宁夏核工业地质勘查院,宁夏核工业地质勘查院,宁夏核工业地质勘查院,宁夏核工业地质勘查院,宁夏核工业地质勘查院

作者简介:

通讯作者:

中图分类号:

P634.5 6

基金项目:


Application of SYZX96 Wire-line Coring Hydro-Hammer in Complex Strata of Gansu Liba Gold Mine and the Effects
Author:
Affiliation:

Ningxia Nuclear Industry Geological Exploration Institute,Ningxia Nuclear Industry Geological Exploration Institute,NingXia NuCeal Industry Geological Engineering Bureau,Ningxia Nuclear Industry Geological Exploration Institute,Ningxia Nuclear Industry Geological Exploration Institute

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在陇南紫金李坝金矿钻探施工中遇强水敏性、破碎、复杂地层,普通绳索取心钻具岩心采取率低,平均采取率86.5%,回次进尺少,多在1 m以下,最小回次进尺只有20~30 cm,钻进效率低,平均台班进尺约5 m。通过使用SYZX96型绳索取心液动锤,钻进效率明显提升,平均岩心采取率提高8%,平均回次进尺提高50%,平均台月效率提高17.5%,纯钻时间增加到了60%左右。共完成6个钻孔,进尺2488 m,其中2个钻孔采用SYZX96型绳索取心液动锤,效果明显。总结出适合强水敏性、破碎、复杂地层绳索取心液动锤的使用经验,为类似地层钻探施工提供技术借鉴。

    Abstract:

    Strong water sensitive and broken formation was encountered in drilling construction in Liba gold mine of Southern Gansu, drilling by ordinary wire-line coring tool resulted in low core recovery and low drilling efficiency, the average core recovery rate was 86.5%, the footage per run was below 1 meter, the minimum was only 20~30cm and the average footage per team was about 5 meters. Good drilling efficiency has been achieved by using SYZX96 wire-line coring hydro-hammer, the average core recovery rate, average footage per run and average machine efficiency per month have been improved by 8%, 50% and 17.5% respectively; drilling time increased to about 60%. Based on the application situation, the paper elaborates SYZX96 wire-line coring hydro-hammer about its structure, working principle and the points for attention in operation.

    参考文献
    相似文献
    引证文献
引用本文

曹学斌,王发民,何玉云,等. SYZX96型绳索取心液动锤在甘肃李坝金矿[J].钻探工程,2016,43(6):30-33.
CAO Xue-bin, WANG Fa-min, heyuyun, et al. Application of SYZX96 Wire-line Coring Hydro-Hammer in Complex Strata of Gansu Liba Gold Mine and the Effects[J]. Drilling Engineering, 2016,43(6):30-33.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-04-11
  • 最后修改日期:2016-05-16
  • 录用日期:2016-05-23
  • 在线发布日期: 2016-06-16
  • 出版日期: