内蒙古某煤矿投料井钻成井施工工艺及控制要点
DOI:
作者:
作者单位:

河北建设勘察研究院有限公司,河北建设勘察研究院有限公司,河北建设勘察研究院有限公司

作者简介:

通讯作者:

中图分类号:

P634.5;TD823.11

基金项目:


Construction Technology and Key Points of Control for Feeding Well Drilling and Completion
Author:
Affiliation:

Hebei Research Institute of Construction & Geotechnical Investigation Co. Ltd.,Hebei Research Institute of Construction DdDd Geotechnical Investigation Co. Ltd.,Hebei Research Institute of Construction DdDd Geotechnical Investigation Co. Ltd.

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    煤矿投料井直径大,采用分级扩孔;耐磨管刚度大,对井眼的垂直度要求高,同时其质量大,对起重设备、器具要求高,施工中容易发生重大的安全或质量事故。本文通过多项工程实践,以内蒙古某投料井为例,总结了投料井钻成井施工工艺及控制要点。

    Abstract:

    Because of the large diameter of mine feeding well, grading reaming is adopted. The wear resistant pipe of feeding well has high stiffness and heavy weight, which has high requirements on borehole verticality, lifting equipments and appliances, serious safety or quality accidents often occur in the construction. Based on a series of engineering practices, with the case of a feeding well in Inner Mongolia, this paper summarizes the drilling completion construction technology of feeding well and the key points of control.

    参考文献
    相似文献
    引证文献
引用本文

张军旗,于俊超,王庆军.内蒙古某煤矿投料井钻成井施工工艺及控制要点[J].钻探工程,2017,44(1):57-60.
ZHANG Jun-qi, YU Jun-chao, WANG Qing-jun. Construction Technology and Key Points of Control for Feeding Well Drilling and Completion[J]. Drilling Engineering, 2017,44(1):57-60.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-06-23
  • 最后修改日期:2016-11-14
  • 录用日期:2016-11-24
  • 在线发布日期: 2017-02-20
  • 出版日期: