柴家沟钼矿复杂地层岩心钻探技术
DOI:
作者:
作者单位:

华北地质勘查局五一四地质大队

作者简介:

通讯作者:

中图分类号:

基金项目:


Core Drilling Technology for Complex Strata in Chaijiagou Molybdenum Deposit
Author:
Affiliation:

514 Brigade of North China Geological Exploration Bureau

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    柴家沟钼矿地层破碎、裂隙发育、蚀变多样、涌水、完整岩石坚硬,而且地质设计要求大部分为斜孔,钻探施工中遇钻孔漏水、坍塌掉块、进尺缓慢、跑斜严重等技术难题。从钻孔结构、冲洗液配置、护壁堵漏、硬岩钻进、涌水地层加重泥浆的使用、立轴式钻机斜孔施工注意事项等方面总结了钻探施工经验。

    Abstract:

    Strata breaking, fracture development, alteration diversity, water gushing and hard intact rock co-exist in Chaijiagou molybdenum deposit, and most of the geological design requirements are inclined holes. The technical difficulties were countered in drilling construction, such as water leakage, collapse and block falling, slow footage and serious inclined drilling. This paper summarizes the experience of drilling construction in borehole structure, flushing fluid solution configuration, wall protection and plugging, hard rock drilling, the use of weighted mud in water gushing formation and the precautions of inclined hole construction with vertical shaft drilling rig.

    参考文献
    相似文献
    引证文献
引用本文

王洪涛.柴家沟钼矿复杂地层岩心钻探技术[J].钻探工程,2017,44(8):37-40.
WANG Hong-tao. Core Drilling Technology for Complex Strata in Chaijiagou Molybdenum Deposit[J]. Drilling Engineering, 2017,44(8):37-40.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-09-14
  • 最后修改日期:2017-06-18
  • 录用日期:2017-06-20
  • 在线发布日期: 2017-09-18
  • 出版日期: