南京长江江心洲超大直径盾构接收井明挖段 超深基坑降水技术研究
DOI:
CSTR:
作者:
作者单位:

中铁十四局集团大盾构工程有限公司

作者简介:

通讯作者:

中图分类号:

U455.49

基金项目:


Study on Dewatering Technology of Ultra-deep Foundation Pit in Opening Cut Section of Super-large Diameter Shield Receiving Well in River Island of Nanjing Yangtze River
Author:
Affiliation:

Large Diameter Shield Co., Ltd. of China Railway Bureau 14 Group

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    南京长江隧道盾构接收井地处江心洲上,开挖地层以粉细砂层和砾砂层为主,降水施工中成功地克服了强透水地层分布厚、受承压水影响大、基坑开挖深度深、民房离基坑边沿距离近、降水技术复杂、地表沉降控制难等一系列技术难题。本文对基坑降水方案设计、施工工艺及地表沉降控制等方面进行了研究和总结。

    Abstract:

    The shield receiving well in Nanjing Yangtze tunnel is located at the river island; the excavation is mainly in fine sand layer and gravel sand layer. In the dewatering construction, a series of difficulties are successfully overcome, such as thick strong permeability formation, great influence of confined water, deep excavation depth, close distance from civil house to foundation pit, complex dewatering technology and difficult ground settlement control. In this paper, the study and summary are made on the design of foundation pit dewatering, construction process and ground settlement control.

    参考文献
    相似文献
    引证文献
引用本文

李洪财.南京长江江心洲超大直径盾构接收井明挖段 超深基坑降水技术研究[J].钻探工程,2018,45(5):87-92.
LI Hong-cai. Study on Dewatering Technology of Ultra-deep Foundation Pit in Opening Cut Section of Super-large Diameter Shield Receiving Well in River Island of Nanjing Yangtze River[J]. Drilling Engineering, 2018,45(5):87-92.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2017-12-20
  • 最后修改日期:2018-03-21
  • 录用日期:2018-04-13
  • 在线发布日期: 2018-06-15
  • 出版日期: