地铁车站与高铁站房共建综合站区深基坑监测及分析
DOI:
CSTR:
作者:
作者单位:

中铁十四局集团大盾构工程有限公司

作者简介:

通讯作者:

中图分类号:

TU473.2

基金项目:


Construction Monitoring of Deep Foundation Pit of Comprehensive Station Area Sheared by Subway Station and High-speed Railway Station and the Analysis
Author:
Affiliation:

Large Diameter Shield Co., Ltd. of China Railway Bureau 14 Group

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以沪通铁路南通西站综合站区基坑施工为例,介绍了南通轨道交通预埋地铁车站深基坑与沪通铁路高架站共建施工中,对基坑围护及开挖施工全过程实时监测,对监测数据进行分析,对围护、监测方案进一步论证,确保了地铁基坑工程与铁路高架桥共建的安全性。

    Abstract:

    Taking the foundation pit construction of the comprehensive station area sheared by a Nantong subway station and Nantongxi Station of Shanghai-Nantong railway as an example, this paper introduces the real time monitoring of the whole process of the foundation pit enclosure and the excavation in the construction of the deep foundation pit of a reserved Nantong rail transit station. Based on the analysis on the monitoring data, the enclosure and monitoring schemes are further demonstrated to ensure the safety of subway foundation excavation and railway viaduct construction in the same period.

    参考文献
    相似文献
    引证文献
引用本文

邱庆翌.地铁车站与高铁站房共建综合站区深基坑监测及分析[J].钻探工程,2018,45(6):52-56.
QIU Qing-yi. Construction Monitoring of Deep Foundation Pit of Comprehensive Station Area Sheared by Subway Station and High-speed Railway Station and the Analysis[J]. Drilling Engineering, 2018,45(6):52-56.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-05-28
  • 最后修改日期:2018-06-13
  • 录用日期:2018-06-14
  • 在线发布日期: 2018-07-09
  • 出版日期:
文章二维码