黄河三角洲沿海滩涂井场填方设计与施工
DOI:
作者:
作者单位:

1.中国地质科学院勘探技术研究所,河北 廊坊 065000; 2.广州海洋地质调查局,广东 广州 510075;3.中国冶金地质总局山东正元地质勘查院,山东 济南 250101

作者简介:

通讯作者:

中图分类号:

P634;TU472

基金项目:

中国地质调查局地质调查项目“海域天然气水合物资源试采工程实施(中国地质科学院勘探技术研究所)”(编号:DD20189601);广东省促进经济发展专项资金(海洋经济发展用途)项目“天然气水合物定向井开采技术试验与优化”(编号:GDME-2018D003)


Design and execution of well site backfilling in beach ofthe Yellow River Delta Coast
Author:
Affiliation:

1.The Institute of Exploration Techniques, CAGS, Langfang Hebei 065000, China;2.Guangzhou Marine Geological Survey, Guangzhou Guangdong 510075, China;3.Zhengyuan Institute of Geological Explorationof Shandong, Jinan Shandong 250101, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    中国地质调查局“海域天然气水合物陆地试采工程”项目组在山东省东营市的沿海滩涂地区建设了一处钻井试验基地。该钻井井场地基土是黄河三角洲的典型粉沙质粘土,存在微振液化特性。对比填方方案在造价、工期、环保和适用性等方面的优缺点,选择灰土垫层施工方案并严格控制施工质量。灰土垫层可以形成有效的隔水层,隔离地下水上升通道和地表水下渗通道,切断微振液化的根源,同时杜绝场地内工程污水的下渗。填方施工全程采用静压压实填土配比,避免了孔隙水上升、土体产生微振液化效应。填方区域分为重载区和轻载区,采用不同的填方方案,既满足了承载力要求,又节约了成本。该填方方案取得了良好的施工效果,为试验基地的顺利运行提供了保障。

    Abstract:

    The project team of China Geological Survey “Land Trial Production of Natural Gas Hydrate in Sea Area” has constructed a drilling test site in the coastal beach area of Dongying City, Shandong Province. The foundation soil of the site is typical silty clay in the Yellow River Delta, which has the characteristics of micro-vibration liquefaction. By comparing the advantages of cost, construction period, environmental protection and applicability, the project team chose the construction scheme of lime-soil cushion and strictly controlled the construction quality. Lime-soil cushion can form effective water-proof layer, isolate groundwater rising channels and surface water seepage channels, avoid the causes of micro-vibration liquefaction, and eliminate the seepage of construction waste water in the site. At the same time, static compaction was used throughout the backfilling construction to avoid the upward migration of pore water and micro-vibration liquefaction effect of soil. The backfilling area is divided into heavy-load area and light-load area. Different backfilling schemes were adopted, which not only met the bearing capacity requirements, but also saved costs. The backfilling schemes have achieved good construction results, ensuring the smooth operation of the test site.

    参考文献
    相似文献
    引证文献
引用本文

张化民,于彦江,秦如雷,等.黄河三角洲沿海滩涂井场填方设计与施工[J].钻探工程,2019,46(3):63-67.
ZHANG Huamin, YU Yanjiang, QIN Rulei, et al. Design and execution of well site backfilling in beach ofthe Yellow River Delta Coast[J]. Drilling Engineering, 2019,46(3):63-67.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-01-07
  • 最后修改日期:2019-01-29
  • 录用日期:2019-01-31
  • 在线发布日期: 2019-03-14
  • 出版日期: