云南金平长安金矿大倾角地质取心钻孔施工技术
作者:
作者单位:

中国地质调查局昆明自然资源综合调查中心


Construction technology of large angle hole ZK2901 in Chang'an gold mine, Jinping, Yunnan
Author:
Affiliation:

Kunming Center of Natural Resources Survey

  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    随着近年来矿产资源勘查要求的提高,岩心钻孔的深度及地层复杂性也不断加大,为能精准的钻遇靶区矿体以实现地质目的,对钻孔轨迹控制的要求越来越高。本文介绍了长安金矿ZK2901钻孔的施工概况,解决了孔壁坍塌、掉块、断钻事故、钻孔超径、孔深轨迹控制、复杂地层取心等一系列施工技术难题。总结了大倾角地质取心钻孔施工的经验。为大倾角地质取心钻孔施工提供了技术借鉴。

    Abstract:

    : With the increasing demand for mineral resource exploration in recent years, the depth of core drilling and the complexity of strata have been increasing, leading higher requirements for controlling the trajectory of drill holes in order to accurately target the ore bodies and achieve geological objectives. This paper introduces the construction overview of the Z2901 drill hole at the Chang"an gold mine, and addresses a series of technical difficulties such as wall collapse, rock falling, drill breakage accidents,-gauging of drill holes, depth trajectory control, and core sampling in complex strata. It summarizes the experience of construction of large-angle geological core drilling, provides technical references for the construction of large-angle geological core drilling.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-12-04
  • 最后修改日期:2025-03-17
  • 录用日期:2025-04-01
文章二维码