坦桑尼亚维多利亚湖金矿区钻探技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

企业委托项目“小秦岭深部整装勘查钻探”和“偃龙煤田铝(粘)土矿钻探”


Drilling Technologies of Golden Ore District at Victoria Lake in Tanzania
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    坦桑尼亚维多利亚湖绿岩带金矿勘查项目包括7个钻孔、2500 m的钻探工作量。实际完成钻孔12个,完成钻探工作量3201.2 m,创造出单机5个月时间内完成钻探工作量和钻探产值最高队史记录。论文分别从地理与地质概况、钻探设备、钻探工程技术、钻头、泥浆和主要经济指标等方面介绍了该矿区使用的钻探工程技术,可供类似地区的钻探工程施工进行参考。

    Abstract:

    Greenstone belt golden ore prospecting project at Victoria Lake in Tanzania consisited of seven boreholes and a total of 2500 meters of drilling. In fact, twelve boreholes were completed and a total of 3201.2m meters of drilling were realized. It created our record of maximum drilling meters and drilling production in five months using one drill rig. The paper introduces drilling technologies used on this district from the aspects of geographic and geological overview, drilling equipments, drilling technologies, drill bit, drilling mud and main economic indicators. It may offer guidance for drilling in similar districts.

    参考文献
    相似文献
    引证文献
引用本文

杨宽才,田敏,曾石友,等.坦桑尼亚维多利亚湖金矿区钻探技术[J].钻探工程,2012,39(Z1):113-116.
YANG Kuan-cai, TIAN Min, ZENG Shi-you, et al. Drilling Technologies of Golden Ore District at Victoria Lake in Tanzania[J]. Drilling Engineering, 2012,39(Z1):113-116.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-07-31
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: