2m Diameter Zhuhai Bridge Bored Pile HOle Completion in Guandong Province
DOI:
Author:
Affiliation:

Clc Number:

U443.15

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Rooer bits and pump suction reverse circulation teehnique are applied in completion of 2.0mand2.2m diameter bridge bored pile hole in construction of Zhuhai bridge paramerers technical requirements onoperating large diameter, mechanical equipment on off-shore platform,accidental remedying and feasibility of drillingwith bits in soft formations are discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: January 25,1994