Construction Technique of Raked Anchor Piles for Foundation Reinforcement
DOI:
Author:
Affiliation:

Clc Number:

TU753.8

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Raked anchor construction of a diaghragm is taken as an example to deseribe the constructionprocess of raked anchor piles,which mainly include:design of raked anchor;selection of construction equipmentand design of drilling tools;construction process of grouting.