Procedures of Auger Drilled and Hydraulic Underrreamed Grouted Pile
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    considering problems existing in auger,underreamed piles in loose sand and boulder formation,auger drilled and hydraulic underreamed grouted piling technique is developed successfully applied,Description is fo-cused on structure of drill rig and underreamer,as well as technical economical benefit.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: January 25,1995
Article QR Code