Bored Pile Construction of An Overhead Crossing Bridge Foundation
DOI:
Author:
Affiliation:

Clc Number:

U443.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper describes the main equipment and technique employed in the foundation pile construc-tion for the overhead crossing bridge on Jinshui road in Zhengzhou and the measures taken to deal with a fewproblems in construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: July 25,1995