Bored Pile Construction of An Overhead Crossing Bridge Foundation
DOI:
Author:
Affiliation:
Clc Number:
U443.1
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This paper describes the main equipment and technique employed in the foundation pile construc-tion for the overhead crossing bridge on Jinshui road in Zhengzhou and the measures taken to deal with a fewproblems in construction.