Abstract:Study is dealt with the jet grouting lifing speed by setting up lab jet grouting modelling device.The modelling results and initial analysis show that piling completion quality will not influenced with groutingspeed properly increased.Tests at a Guang Zhou site indicate that use of medium speed grouting can save cementwhile the pile bearing capacity will not change after the grouting returns to the surface.