Abstract:The hazardous rock mass of the Lianziya Cliff is outlined with the anchor hole drilling technology for the treatment presented, including the mounting of the drill on the overhead scaffold, prevention and measurement of the hole deviation, drilling in the broken zone and large fracture, as well as sealing of the fracture.