Controlled Directional Deep Hole Drilling in The Sharp Slanted Orebody at Duobaoshang Tongshan
DOI:
Author:
Affiliation:

Clc Number:

TD231.61,

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Most of the newly located holes for the exploration of the old mines are infilled between or lie behind two existing holes. In the light of this feature, the design method of the axis of the newly positioned hole is presented with the kicking off and deviation correction measures, resulting in good effect.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: March 25,1998