Abstract:The experience for cutting and demolishing of the ball mill foundation at a cement plant using controlled balsting is introduced. Also applied successfully is the method of millisecond multi relay ignition by the non electric detonator outside holes, in order to increase the relays of detonation in controlled blasting.