Treament of Underground Water in the Foundation Pit of Wuhan Changjiang Square
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU463

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the engineering geological and hydrogeological and enviromental conditions in jobsite, the selection of groundwater treatment method in foundation pit of Wuhan Changjiang Square is discussed, and the construction technology of curtain grouting as well.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:March 10,1998
  • Adopted:
  • Online:
  • Published: March 25,1999
Article QR Code