Application of Advanced Anchor Short Cycle Method to Constructing Tunnel Branch Portal in Sandy and Gravel Formation
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The advanced anchor short cycle method used for solving the technical problems encountered while constructing tunnel branch portal in sandy and gravel formation is introduced. Safety technical requirements referring to state run road, pressure lifting station and the important buildings nearby are met.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: September 25,1999