Determining Valid Vertical Space in Observation Hole of Dike dam
DOI:
Author:
Affiliation:

Clc Number:

TV698.11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Geometric construction method determining valid vertical space in observation hole based on surveying data is derived. The computer programming method based geometric construction and the mathematical foundation controlling drilling construction quality of observation hole are introduced.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:December 08,1998
  • Adopted:
  • Online:
  • Published: September 25,1999