Tests on Post Grouting into Bored Pile in Shanghai
DOI:
Author:
Affiliation:
Clc Number:
TU753.3
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The article introduces the tests on post grouting into bored pile in construction engineering in Shanghai, analyses the test results, presents some technical measures and practice deserving of attention in application.