Abstract:Combined lining of the primary bolting and shotcrete lining and the secondary formwork puring concrete lining is applied to the system of waterproofing and drainage at Yanlieshan tunnel of Jiujiang Jingdezhen road. The design, construction and quality control of the system are introduced.