Hebei Lijiagou Road Tunnel Construction Design
DOI:
Author:
Affiliation:

Clc Number:

U455

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The profile of the Lijiagou Road Tunnel carried out the short bench and full face excavation. The re bar net preliminary lining mould shotcrete and preliminary and anchor shotcrete are used for support by the use of the semi wet spraying method with sand entrapped in cement. The lining is completed in two steps. Smooth surface blasting is performed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:July 15,2000
  • Adopted:
  • Online:
  • Published: September 25,2000