Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
DOI:
Author:
Affiliation:

Clc Number:

TU473.1+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The design and construction method of hand dug piles with post grouting by the driven tube at the pile end is introduced with reference to the field cases. Not only does it eliminate the manual underreaming process in the sand layer with pressure bearing water, but also increase the single pile bearing capacity.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:February 21,2001
  • Adopted:
  • Online:
  • Published: September 25,2001