New Understanding on the Mechanism of Post Grout Injection for Bored Piles
DOI:
Author:
Affiliation:

Clc Number:

TU473.1+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The mechanism of increase of the bore pile bearing capacity by post grouting has been further understood through analysis of the testing results of bored piles with post grouting in Shanghai. Some suggestions on how to use the post grouting technique properly is put forward.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:April 17,2000
  • Adopted:
  • Online:
  • Published: September 25,2001