Water Blocingk-off Method for the Cemented Grouting Coal Mine Drift
DOI:
Author:
Affiliation:

Clc Number:

TD263

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    分析了固结灌浆煤矿巷道堵水施工的机理 ,并结合工程实例介绍了固结灌浆法煤矿巷道堵水工程实践与处理效果。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:July 25,2001
  • Adopted:
  • Online:
  • Published: March 25,2002