Rammer Drilling Technique for Installation of Electricity-power Cable across Guang-Shen Line
DOI:
Author:
Affiliation:

Clc Number:

U175

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    广州市汇景新城电力迁线跨广深线 ,利用H30 0型夯管锤铺设 70m长的 4 2 6mm钢管 ,介绍了施工过程中解决的技术难点和施工经验。