Study on the Coeffecters of Controlling Blast in the Construction of Road-blast
DOI:
Author:
Affiliation:

Clc Number:

U416.113

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Some road construction blasting should be carried out near the area of the fiber-cable, high-voltage wires and buildings. In these circumstance, we should effectively control the casting direction, the distances of cast and the blast-vibration, which are studied in detail on the paper.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 09,2002
  • Revised:June 14,2003
  • Adopted:
  • Online:
  • Published: