Application of Arch Ring in Foundation Pit Support
DOI:
Author:
Affiliation:

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The alternative of stopping water by curtain wall with two row of underground mixing piles and stopping soil by arch ring was adopted in Zhuhai Seaside Mansion. The points should be put attention on in design and construction of arch ring support structure was introduced. That the deformation of the arch ring support structure is smaller was validated by monitoring data.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 14,2004
  • Revised:June 14,2004
  • Adopted:
  • Online:
  • Published: