Main Engineering Geologic Problems and Countermeasures in TBM Excavation of Shanggongshan Tunnel
DOI:
Author:
Affiliation:

Clc Number:

TV554.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper expounded main engineering geologic problems met with in TBM excavation of Shanggongshan Tunnel, such as fault fractured zones, joint concentrated zones, big deformation of soft rock, karst and groundwater etc, and introduced corresponding countermeasures in detail.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 22,2004
  • Revised:September 22,2004
  • Adopted:
  • Online:
  • Published: