Engineering Tech.of Statically Pushed Piles
DOI:
Author:
Affiliation:

Clc Number:

TU473.13

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    介绍静压管桩的施工技术、硬夹层预钻孔施工方法、质量与安全保证措施以及典型工程实例和取得的效果。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 08,2004
  • Revised:June 08,2004
  • Adopted:
  • Online:
  • Published: