Analyses on Causes of A Large Number of Piles Broken in Driven Cast-in-place Pile
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Base on two concrete engineering examples, the author came to the conclusion that a large number of piles broken in driven cast-in-place pile are due to the incorrect digging of foundation pit late. Besides, some methods to prevent the piles broken and to deal with them are discussed.