Management of Borehole Cave-in in Front-end Engineering of Hong Kong Route 5
DOI:
Author:
Affiliation:
Clc Number:
U445.551
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This paper describes the remedial works adopted for soil collapsed during bored pile excavation for the advance contract for route 5 section between Shek Wai Kok & Chai Wan Kok in Hong Kong.