Quality Control for Pre-stressed Anchorage Cable Installation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U417.116

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    以粤赣高速公路二标段K6+865~K7+009高边坡锚索框架梁施工工程为例,介绍了预应力锚索施工过程中的质量控制技术。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 13,2005
  • Revised:June 13,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code