Application of High Pressure Grouting in Leakage Prevention Dam of Jinshao Powerhouse Temporary Bulkhead
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU543.8

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The design methods,engineering techniques and good leakage prevention results of high pressure grouting leakage prevention barricade wall were introduced. The paper took the engineering case of leakage prevention project in Jinshao Powerhouse temporary bulkhead by high pressure grouting project.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 12,2005
  • Revised:August 12,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code