Application of Underground Excavation under Shallow Cover in Tunnel Construction
DOI:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction techniques of excavating tunnel under shallow cover which is Ⅱ、Ⅲtype surround rocks in city was introduced. “Short excavation, quickly closed, strongly support and frequently measuring” were taken as guidance during construction. The tunnel was excavated separating upper and down parts. The prompt initial support ensured the safe construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 23,2005
  • Revised:August 23,2005
  • Adopted:
  • Online:
  • Published: