Application of Pre-stressed Anchor Cable with Frame Beam in Margin Slop Improvement
DOI:
Author:
Affiliation:

Clc Number:

P642.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The idea that the margin slop stability problems caused by excavation should be put attentions when make construction near by the slops and dyke was put forward based on project practice of slop improvement in excavation of Longze Garden in Xiangshan County. That the pre-stressed anchor cable with frame beam is an efficient method to improve the slops when the slops are steep and the places are limited was also brought forward.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 07,2004
  • Revised:December 07,2004
  • Adopted:
  • Online:
  • Published: