Elementary Introduce to the Construction Technology of Bored Pile Offshore
DOI:
Author:
Affiliation:
Clc Number:
U443.154
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The paper introduces the construction technology of bored pile on Donghai Bridge. It explains some key technology in detail. Meanwhile, the bored equipment is introduced, and it also introduces how to compound fresh slurry used.