Discussion on Exceeded Deliver of Prestressed Tube Pile in Xiamen Campus of Huaqiao University
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.13

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    以华侨大学厦门校区为例,对厦门湾地带采用预应力管桩沉桩超送问题的成因进行了分析,并提出了处理方法。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 11,2005
  • Revised:April 11,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code