Abstract:Example of reinforcement to underwater foundation of the cargo and container gravity wharf is taken to introduce the blasting ramming test. The nonrecurring blasting ramming parameters for thick base made of stone-block are obtained and the construction process is monitored to sum up the experience and lessons in similar engineering construction.