Abstract:According to the geological conditions of runway system in Pudong Airport,testing proposal of "well point dewatering Cushion impaction and grind" was put forward and was monitored and detected during the testing procedure.Test data was analyzed to provide direct basis for design,construction and working out the detecting standard for large scale subgrade treatment.