Abstract:Based on the existing criterion of foundation pit, the analytic solution and theory solution for horizontal loaded pile were taken into account to simplified calculation m'. A computer program for the method was developed. The analyses and calculation for actual engineering was made. It was found after comparing the calculation with data measured that the method has high value