Discussion on Blasting Excavation Method of Cut Slope
DOI:
Author:
Affiliation:

Clc Number:

U416.113

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Following the specification of road foundation construction, the practical blasting method for slope excavation was given out under the general road foundation construction conditions, to meet the quality requirements of cut slope construction along the rail and high way, and to reduce the work increment brought by trim blasting method. The possibility, necessity and reasonableness of using trim blasting and presplit blasting were analyzed on technological and engineering views.