Construction Tech. of a Deep Foundation Pits in Dense Buildings
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The design, construction, and deformation monitor methods for a deep foundation pit support and water drain project constructed among dense buildings in Shengyang were introduced. The deformation monitor results were analyzed. The experience of design and engineering for foundation pit excavation among dense buildings in Shengyang was summed-up.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 16,2005
  • Revised:December 16,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code