Abstract:The sewage modification project in Taicang City of Jiangsu required high accuracy of pipeline laying. The pipes were double wall PE Pipes. Their strength is low. It is a challenge to current trechless technology. The difficulties and design main points of the project were introduced. Meanwhile the problems encountered during construction were analyzed.