4/17/2025, 12:08:23 PM 星期四
Down-the-hole Hammer Combined with Auger Drill in the Pile of Rock Foundation
CSTR:
Author:
Clc Number:

TU473.14

  • Article
  • | |
  • Metrics
  • | |
  • Related [20]
  • |
  • Cited by [0]
  • | |
  • Comments
    Abstract:

    Down-the-hole hammer was used in the pile of rock foundation with auger drill, which not only make the most of DTH hammer in small diameter construction in hard, fragile, broken layer and auger drill in large diameter construction with high speed but also developed the field in rock foundation, and raised the efficiency of auger drill used for pile of rock foundation in mid-hard layer. This case provided the relative technique and experience.

    Reference
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1226
  • PDF: 523
  • HTML: 192
  • Cited by: 0
History
  • Received:December 18,2005
  • Revised:May 23,2006
Article QR Code