Discussion on the Part Inflowing Model of Xuefeng Mountain Tunnel
DOI:
Author:
Affiliation:

Clc Number:

U456.32

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Real-time monitor is made to the groundwater with the completion of Xuefeng Mountain Tunnel. Inflowing model of triangular prism is reducted and tested to show its practice value.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 31,2005
  • Revised:June 01,2006
  • Adopted:
  • Online:
  • Published: