Discussion on the Part Inflowing Model of Xuefeng Mountain Tunnel
DOI:
Author:
Affiliation:
Clc Number:
U456.32
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Real-time monitor is made to the groundwater with the completion of Xuefeng Mountain Tunnel. Inflowing model of triangular prism is reducted and tested to show its practice value.