Practice of Hole Completion by Auger Drilling Technology in Pile Foundation Construction of a Power Plant in East of Guizhou
DOI:
Author:
Affiliation:

Clc Number:

TU473.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    论述了旋挖钻进成孔工艺在黔东某电厂桩基工程中的选用、工程桩施工遇到的问题及采取的处理措施。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 21,2006
  • Revised:February 21,2006
  • Adopted:
  • Online:
  • Published: