Construction Technology of Testing Borehole in Changjiang Highway Bridge of Suzhou - Nantong
DOI:
Author:
Affiliation:

Clc Number:

U443.154

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Heavy pile group foundation was taken as the main pylon for Changjiang highway bridge of Suzhou - Nantong, hole boring technique was tested through simulating borehole pile in water before construction by overtopping current specifications. The result of construction technology of testing borehole was introduced in this paper.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 07,2006
  • Revised:November 07,2006
  • Adopted:
  • Online:
  • Published: