Study on Application of Pre-stressed Tubular Pile in Shantou District
DOI:
Author:
Affiliation:

Clc Number:

TU473.13

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.