Construction Technology of Fast Bolt Supporting
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD353.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    通过改进施工机具,优化施工工艺,实现巷道掘进后的快速支护,取得了良好的经济效益和安全效果。

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 25,2006
  • Revised:July 25,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code